Home Blog Page 601

Music: Unlikely collaboration creates pure magic

0

As far as unlikely musical collaborations go, Andy Kim and Kevin Drew’s isn’t that big of a stretch. They both croon from the heart about love and relationships and craft delicate pop gems. It just happens that there’s a few decades between them. But, as their new album, It’s Decided, indicates, together they’ve found a special kind of musical chemistry that just doesn’t come around very often. And the magic shines through.

Kim, a pop star in the late ’60s and early ’70s behind hit songs such as “Rock Me, Gently,” first met Drew, of Broken Social Scene fame, when he performed at one of Kim’s annual holiday concerts in Toronto.

Apparently, something clicked. Meeting with them at the Rivoli during a day of promotions for their new album finds a pair as thick as thieves. 

“It’s about relationships,” says Kim. “This album, really, was made because we wanted to hang together.”

As someone who wrote songs in the famed Brill Building in the ’60s, where the production engineers wore a suit and tie and singers rarely knew the musicians backing up their tracks, the entire process was a welcomed change for Kim. 

“I’ve never even been in a band,” says Kim, of why making this album changed his life. 

“Every time I made a record, not so much strangers, but these musicians would come and play and be gone. I’m not hanging out with anybody, so this was a brand new experience. It allowed me to create within a family.

Before Kim came along, Drew says he was in a slump, worn out by the pressures that came with years of directing the massive, organic movement that is Broken Social Scene. And suddenly here’s this guy and he just wants to work with Drew.

“People ask me why I would work with Andy. It’s because he saw the creative constipation that I had at the end of my 10-year career with just so many people, so much responsibility,” Drew says. “And he just went, no — cut through everything — and said, ‘That’s that. Let’s go do that. And I said, ‘Oh you want me, well all right, what are you doing tomorrow?’ ”

The pair worked on songs for the new album along with Drew’s regular writing partner Ohad Benchetrit before heading into the studio with Dave Hamelin (the Stills) at the controls and a steady stream of guest artists eager to work on the unique project. The album was released Feb. 24 on the Arts & Crafts label, and the pair will be playing the Field Trip music festival in June. 

“When I listen to the album today, I am so thrilled it has my name on it,” says Kim. 

“It was a lot of time and effort and creative intelligence put into this, and you mix it in with the spirituality. I just hear it all when I’m listening.”

Rejuvenating T.O.’s urban forest

0

As we leave behind another bitterly cold winter, new buds on the trees are some of the first signs of spring. This year, like last year, we’ll see fewer of those cheerful green shoots because there are fewer trees. The ice storm of 2013 devastated Toronto’s landscape with 20 per cent of the tree canopy lost, and it continues to face threats from the emerald ash borer. Doing nothing is not an option!

I invite residents of our neighbourhood to join me in restoring the tree canopy by planting a new tree in both your front yard and backyard.

The City of Toronto will gift a tree for the city-owned portion of your front lawn. Just contact 311 with your request, and it will be done in autumn 2015! Go to www.toronto.ca/trees/tree_planting to see the species of tree that are available and for more details on the program.

Ward 21 is also partnering with the non-profit LEAF (Local Enhancement & Appreciation of Forests) to help you with the costs of planting in your backyard. You may purchase trees for your backyard for $165 to $235 each, including site consultation, delivery and planting. Contact LEAF at 416-413-9244 or [email protected].

By planting a tree, you will enhance the value of your property as well as your quality of life! In its lifespan, each tree generates $30,000 in oxygen, cleans up $60,000 worth of air pollution and recycles $35,000 worth of water. They also help lower heart rates and reduce stress levels.

Please join us in rejuvenating an urban forest that everyone will enjoy for generations to come!

Connecting with community

0

My commitment is to serve my residents with a strong, dedicated voice and ensure Ward 5 remains sustainable while embracing growth and stability. 

As an effective councillor, my job is to engage the constructive and proactive participation of residents, listen to theirs voice and act only in their best interests for the greater public good. 

Richmond Hill is in transition with residents undergoing provincially mandated intensification pressures as per Ontario’s Growth Plan for the Greater Golden Horseshoe. With condominium buildings rising on both sides of Yonge Street, our main north-south roadway, traffic patterns and the fabric of our internal neighbourhoods are directly affected. By working proactively together, we can design and build our town so that we are able to grow with it as it grows. I am establishing two important resident outreach initiatives, the Ward 5 civic engagement committee and regular ward-wide meetings, to further my mandate to effectively engage Ward 5 residents. 

The committee will assess the needs of Ward 5, enhance residents’ influence in far-reaching decisions (39 residents have signed up) and meet quarterly. The meetings will feature guest speakers, who will highlight Ward 5 and Richmond Hill matters, followed by an open Q & A forum. Richmond Hill’s Department of Community Services staff will be present at the June 2015 meeting, serving the needs of all residents, from road operations and maintenance to our recreational and park services enjoyed by all. 

Together we will make Ward 5 our place to live, learn, work and play!

City needs a new heritage class?

0

The recent demolition of Stollerys at 1 Bloor St. W. is only the latest example of Toronto’s inability to preserve its architectural heritage. If we don’t act soon to strengthen preservation policies, we are in danger of losing many more significant buildings, including several in our midtown community.

That’s why I moved a motion — entitled Catching Up with the Past: Improving the City’s Heritage Preservation Framework — to ask Toronto’s planning staff to create a new heritage classification category that is more proactive.

Currently, Toronto's heritage inventory only includes those properties that have been officially listed or designated under the Ontario Heritage Act. To gain heritage status, a property must go through a lengthy process including a full evaluation and completed staff research report, followed by consideration by both community council and city council. This process can routinely take up to eight months or more.

Although staff is performing their due diligence to determine whether or not a building is worth preserving, there is no protection from demolition.

My motion asks staff to look at adding a new category of “identified” properties. If implemented, this new category will allow the city to protect properties that have been put forward by local residents as being architecturally or historically significant but not yet evaluated, to ensure that no historic building already brought to the attention of city staff can be demolished without consideration.

This additional protection must be put in place as soon as possible.

Bayview Glen to transform in 2016

0

The City of Markham, in partnership with the Toronto and Region Conservation Authority, is finalizing the development of an innovative action plan called Bayview Glen Sustainable Neighbourhood Retrofit Action Plan (SNAP). It will assist in the environmental transformation of the Bayview Glen neighbourhood to promote energy conservation and active transportation, as well as prevent flooding.

In 2014, local residents provided input regarding their needs and preferences for the neighbourhood through surveys, a focus group session, two public meetings and the Bayview Glen School Fair. The resulting action plan, which embraces residents’ feedback, includes three highlights. 

The first highlight is state-of-the-art green infrastructure for sustainable water management on roads and parks.

The second highlight is the renewal of Bayview Glen Park, Glencrest Park and Stonefarm Parkette, which will incorporate renewable energy, naturalization plantings and updated amenities to meet current recreational needs. 

The third highlight is a residential program to help homeowners implement sustainable retrofits at their property.

The project received funding from diverse sources, including the Federation of Canadian Municipalities, Enbridge, Canada Mortgage and Housing Corporation and York Region. The action plan is expected to be implemented starting in 2016 and realized over a five- to 10-year period.

Strengthening heritage policies

0

Heritage properties represent significant value for communities by connecting residents with Toronto’s history and culture. In Willowdale and North York, the preservation of heritage contributes to the dynamic character of our neighbourhoods.

Although development is often a sign of economic prosperity, the recent pressures of intensification have impacted efforts to maintain heritage properties. The demolition of unprotected old buildings to make way for new developments can often result in a regrettable loss.

At the last Toronto City Council executive committee meeting, I passed a motion to keep eight staffing positions from the planning and heritage divisions. This will help support studies for Heritage Conservation Districts and improve overall service levels. As chair of the planning and growth management committee, I recognize the importance of allocating resources to identify and protect Toronto’s heritage properties. By taking proactive measures, the city can prevent historic neighbourhoods like Kensington Market from undergoing the same loss of character as Yorkville Village years ago.

The planning and growth management committee also passed recommendations last month to amend the official plan to strengthen heritage policies throughout the city. 

At the heart of the issue is the balance of competing interests. These initiatives will help the city manage Toronto’s tremendous growth and will allow for a level playing field between communities and developers to produce the best outcome for Toronto.

Spring park projects underway

0

It’s been a winter for the record books, but spring is finally just around the corner. 

There’s no better way to take advantage of the warmer weather than getting outside and enjoying Ward 25’s incredible parks — and they’re about to get even better! 

In York Mills, Mossgrove Park is scheduled for revitalization, and in St. Andrews, Lord Seaton Park is set for an upgrade.

New playground equipment will be installed in both parks next year and consultations to gather neighbourhood input will be underway this spring.

Further south in Lawrence Park (right behind the Locke Library), a new drainage system was installed late last year, setting the stage for a major playground overhaul that’s already started. 

Design work is being finalized based on input from an engaging neighbourhood consultation earlier this year. Construction will soon be underway with completion targeted for the fall.

Over in Don Mills, be on the lookout for a brand new park on The Donway West just south of Lawrence Avenue East. The new park is scheduled to open this spring and will be a welcome addition to one of Canada's first (and best) planned communities.

In the meantime, I encourage you to head over to the Toronto Botanical Garden, which hosts an Organic Farmers’ Market each and every Thursday from 2 to 7 p.m. 

If you’d like to get involved in any of these Ward 25 park revitalizations or have an idea to improve a park in your neighbourhood, just drop me a line at 416-395-6408. 

Save Toronto’s own Central Park

0

Downsview Park is as integral to Toronto’s future as Central Park is to Manhattan’s.

Although this is a bold assertion to some, consider this: Downsview Park’s green space is as distant from our downtown core as Central Park’s is from Manhattan’s lower downtown. 

Specifically, Downsview Park is almost identical in physical distance, driving time, and number of subway stops from Union Station as Central Park is from Manhattan’s lower docks. Imagine if it had been decided in the 1850s to hive Central Park into apartment blocks. 

The federal government is currently attempting such a small-minded fire sale of Downsview Park, and Canadians cannot allow it to continue.Toronto has no shortage of condominium towers. One only has to look at the cranes in our skies to see the evidence. However, our green space is a resource whose scarcity is becoming more pronounced every year. 

In a few decades we will lament the loss of any parkland we had the chance to save. Downsview Park, if permitted to be sold by the federal government to developers, will be considered a travesty by future Torontonians. We are at our own Central Park crossroads. 

Downsview Park once had the title of Canada’s First Urban National Park, which was unceremoniously handed to the Rouge Valley along with necessary money to fund that green space’s operation. It is a political decision for the federal government, not one based on fiscal necessity, to sell off Downsview Park. Visit SetDownsviewFree.com and stand with me to save our green space.

Parka fur angers activists

0

A national non-profit for the humane treatment of animals has filed a false-advertising complaint with the federal Competition Bureau against luxury parka maker Canada Goose, whose head office is located in North York. 

Detailed in 27 pages, Animal Justice Canada Legislative Fund’s (AJCLF) March 11 complaint disputes the company’s claims that its winter jackets use “ethical and responsible” coyote fur.

“We seek to defend and protect animals who are inhumanely trapped for their pelts and advance our mandate so ethical consumers are not preyed upon,” said lawyer Nicholas Wright, executive director of animal advocacy group Animal Justice — a separate entity from AJCLF. “Consumers … [may be] unaware of the cruelty inflicted on these animals,” he added.

Canada Goose, founded in 1957, is best known for its extreme winter outerwear featuring coyote fur around the jacket’s hood. 

“Coyotes, who are often caught in leghold traps, may face predation, suffer from internal bleeding or gnaw on their own leg in order to escape,” he said. 

Wright believes the re-emergence of fur as socially acceptable in the context of fur-trimmed coats is of great concern. 

But there is no evidence to substantiate the brand’s claim that coyote fur is warmer than synthetic fur, Wright said, adding that militaries use faux fur in cold-weather gear.

Alex Thomson, a spokesperson for Canada Goose, declined an interview, but directed Post City to its press statement. 

The brand is “deeply committed to the humane treatment of animals,” according to the company website. 

“We don’t believe that the humane killing of animals for functional purpose is wrong,” it states. “We are confident in both why we use fur and how it is sourced.” 

In an email response, the Competition Bureau confirmed that it has received the complaint but cannot confirm what action will be taken at this time. 

School versus homes

0

After Toronto Catholic District School Board (TCDSB) served Bayview residents with notices of expropriation to allow for the construction of a school, residents certainly weren’t happy, to say the least. But some have now rallied together, collectively hiring a lawyer to fight the case. 

The residents living near Bayview Avenue and Cummer Avenue received the notices of expropriation to allow for the construction of a three-storey, all-girls secondary school that would accommodate approximately 850 students.

Jenni Xi is one such resident working with the lawyer to fight the case and said the whole situation is “unfair.” 

“We want to live in the same area but the housing prices make it impossible for us to buy back,” said Xi. “It’s a hard time.” 

Five months pregnant, Xi also noted that the surrounding amenities would be incredibly convenient for her as a mother in the future. Just across the street is a supermarket, bank and post office. 

But despite her determination, Xi said it’s unlikely that she’ll be able to stay in her home. 

“I heard from our lawyer.… Even with objection success in the hearing, [TCDSB] still has the power to expropriate the townhouses. So the decision doesn’t actually really matter,” said Xi. 

This is due to the province’s Expropriation Act, which allows a public agency to take possession of a property “for a purpose deemed to be in the public interest,” regardless of whether or not the owner is willing to sell it. 

Before the recent demolition, the site was home to an elementary school owned by the Toronto District School Board (TDSB) with a capacity for 400 students — the new proposal calls for double that.

Kathie Shinn is another resident who will have to move out of her home should TCDSB go through with the expropriation. 

“I think they’re being unfair because, you know, they purchased that property knowing how big it was,” said Shinn. “These are our homes; they’re not just houses to be torn down.” 

A resident of the 12-year-old homes for five years, Shinn is currently on a medical leave from work after being diagnosed with a brain tumour. 

“We don’t know whether or not I’m going to have surgery in the future and we have to look for a home too. We have too much on our plate right now.” 

Plan for Ed’s debuts

0

When David Mirvish sold the family property at the corner of Bloor and Bathurst in the Annex neighbourhood that had been home to Honest Ed’s for more than 70 years, some feared the worst. 

In early March, more than 500 people showed up at the Park Hyatt Hotel on Avenue Road to find out about the new development plan. What they might not have expected was an innovative and inclusive design that has garnered near-unanimous support from across the city.

Westbank Properties, alongside Vancouver architect Gregory Henriquez, announced the development would contain 1,000 rental suites and several storefronts and restaurants interspersed throughout 55 buildings, 2.5 to 29 storeys in height and no condominiums for sale. More than 50 per cent of the rental units will be two-bedroom or larger 

The project will incorporate a covered public marketplace, an alleyway dedicated to small startup shops with a plethora of food trucks on standby; and bike-friendly facilities as well as electric car–charging stations and green roofs designed by Toronto landscape architect Janet Rosenberg. 

“We wanted to honour the memory but, at the same time, create a vision that moves forward and captures the same vitality and visionary agenda that Honest Ed’s did back in the ’50s and ’60s when it was in its heyday,” said Henriquez. 

The 29-storey “micro-tower,” one of five on the 1.8-hectare site has a small footprint of just 5,500 to 6,500 square feet. 

According to Henriquez, these towers limit shadowing impacts onto streets, improve access to views and diminish the overall scale of the development. 

“And they’re more attractive,” he added.

Heritage preservation is also a big concern with approximately 14 addresses on Markham Street set to be preserved — including the Victorian row houses on the west side.

David Harrison of the Annex Residents’ Association is delighted to see that the developer has listened to so many concerns raised by the community. 

“There are lots of ticks in lots of boxes,” said Harrison. Although he admits that many community consultations still lie ahead.

Preservation priorities

0

Leaside was nominated to become a Heritage Conservation District (HCD) in May of last year by former councillor John Parker. One of 16 areas currently nominated throughout Toronto. But some local residents are concerned that the process is taking too long and the character of the historic neighbourhood is at risk. 

The most recent report, released in February, calls for only half of those district studies to commence by the end of 2016, with Leaside and Summerhill among those to follow at a later date.

“Several of these areas, including Leaside, face rapid erosion of the heritage character for which they are being nominated,” said Geoff Kettel of the Leaside Property Owners’ Association (LPOA), who is concerned with the slow implementation of the program. 

Carol Burtin Fripp, co-president of LPOA, said that while a lot of people are buying houses in Leaside, what they’re really buying is the lot. The demolition patterns happening in the area have her concerned, as well as the “monster homes” that are going up in place of the existing ones. 

“By the time anyone starts looking at Leaside, there will be hardly anything to look at,” she said. 

The proposed study area for Leaside focuses on the residential portion of the former town border by Bayview Avenue to the west and Laird Drive to the east, north to Glenvale Boulevard, south to Leacrest Road. She cites Parkhurst Boulevard as a particularly notable area relatively untouched by development.

According to Burtin Fripp, residents under HCD designation would be free to renovate the interior of their home, but would have to seek permission to make alterations to the publicly seen exterior. Currently, there are 16 HCDs in the city, including two in nearby Rosedale.

“For a lot of people, their home is their single biggest financial asset,” she said. “We’re not looking to threaten that. We’re simply looking to maintain the nature of Leaside, rather than replace it.”